Update on Summer Bond Construction

"Update Summer 2024 Bond Construction" with worker holding hard hatWhen school is out for the summer, we still have a lot of hard work to do to prepare for the fall. This summer, some of that work will include our Phase 1b Bond Work.

Here's a look at this summer's bond project list:

Fox Lane High School

  • HVAC upgrades Wing A & C, 2nd & 3rd floors A/C

  • Front canopy drainage improvement

 

Fox Lane Middle School

  • Exterior window replacements

  • New unit ventilators and adjacent metal shelving

  • Stairwell aluminum entrances

  • New exterior site lighting and poles

  • Emergency light fixtures throughout building

  • New hot water heaters and water booster pump

  • Cafeteria concrete platform replacement

  • East House exterior stair replacement

  • Walkway bridges repairs and re-asphalt

  • Exterior concrete painting

 

Mount Kisco Elementary School

  • Ceiling A/C units, 2nd floor

  • Kindergarten rooms UV replacements

  • Install boiler room trench drain

  • Two wheelchair lift replacements

  • Wood door and hardware replacements

  • Lead paint removal in boiler room

 

Bedford Hills Elementary

  • New boiler and burner

  • Plumbing fixture replacements

  • Basement exhaust fan and new ductwork

  • Front walk lower plagstone pavers replacement and new railing

  • New gym flooring

  • Corridor luxury vinyl tile install

  • Wood door and hardware replacements

  • New aluminum window system in kindergarten rooms

  • Wall mounted A/C units in kindergarten rooms

  • Resilient flooring kindergarten room

  • Music room carpeting

  • Main entrance door frame replacement

  • Sunshade film on cafeteria windows

  • Exterior asphalt repave area